The Liberia Electricity Corporation (LEC) informs all its customers and the general public that there will be power outages affecting areas of our network as shown in the schedule below. The outages will allow the installation of essential electrical equipment for the smooth running of the Monrovia power grid. The Liberia Electricity Corporation regrets any inconvenience this exercise will cause. All are advised to make necessary preparations in relation to these power outages.
Network Upgrade Related Planned Outages for October 24 Through 29
Feeders | Date/Time | Duration | Action | Work to be Carried Out | Implementer | Load |
---|---|---|---|---|---|---|
Paynesville Congo Town Feeder | October 24, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 Erection of MV poles, stringing of MV lines, Jumper closing and transformer commissioning |
Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 24, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Capitol Kru Town | October 24, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol – Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, Public Works, Gender. GSA, MCC, Sonewien, Coconut Plantation, National Police Head Quarter, Spring Mineral water, Buzzy Quarter, PHP Community, ATS, Rally Town Market, | |||||
Water & City | October 24, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town | |||||
Mamba Point 22KV Feeder | October 24, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Load Involved | 13.9 | |||||
Congo Town Back Road | October 25, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 25, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Paynesville Duport Road | October 25, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Capitol Congo Town | October 25, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Load Involved | 15.1 | |||||
Paynesville Congo Town Feeder | October 26, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 | Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 26, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Water & City | October 26, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town. | |||||
Mamba Point 22KV Feeder | October 26, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Capitol Kru Town | October 26, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol – Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, Public Works, Gender. GSA, MCC, Sonewien, Coconut Plantation, National Police Head Quarter, Spring Mineral water, Buzzy Quarter, PHP Community, ATS, Rally Town Market | |||||
Gardnesville Johnsonville | October 26, 2022
9 a.m. to 5 p.m. |
8 hours | Gardnesville Johnsonville | Maintenance | LEC – FBBU | 0.3 |
Communities | Johnsonville, Back of Chicken Soup Factory, Chicken Soup Factory Gulf. | |||||
Load Involved | 14.2 | |||||
Paynesville Congo Town Feeder | October 27, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 | Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 27, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Water & City | October 27, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town. | |||||
Mamba Point 22KV Feeder | October 27, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Capitol Kru Town | October 27, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol – Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, Public Works, Gender. GSA, MCC, Sonewien, Coconut Plantation, National Police Head Quarter, Spring Mineral water, Buzzy Quarter, PHP Community, ATS, Rally Town Market | |||||
Paynesville Gate – 15 | October 27, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Gate – 15 shutdown | Maintenance | LEC – FBBU | 0.9 |
Communities | Nimba United, Wacut, New Jerusalem community, Israel community, Copper Farm, Fendell, Yellow House community, Carrayburg, Monie Cartan Farm, Gate – 15. | |||||
Load Involved | 14.8 | |||||
Congo Town Back Road | October 28, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 28, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Capitol Hill | October 28, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Hill shutdown | Erection of MV and MV poles and stringing activities. | Planning MBH/EU LEC – FBBU |
0.5 |
Communities | Capitol Building, Foreign Affairs, Internal Affairs, University of Liberia main Campus, Stella Marries, Executive Mansion & Budget Bureau. | |||||
Capitol Congo Town | October 28, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Gardnesville Redlight | October 28, 2022
9 a.m. to 5 p.m. |
8 hours | Gardnesville Redlight shutdown | Maintenance | LEC – FBBU | 5.1 |
Communities | Stephen A. Tolbert Estate, Black Gina, New Hope Junction, St. Francis community, Jacob’s Town, Neezoe, Jallo Shop, Pipeline Super Market, Pipeline Road, Johnsonville, Wood Camp, Morris’ Farm, Coca Cola Factory, Moses Blah Community, Omega Market, Red Hill Field, FDA up to Mount Barclay, 72nd Community, View Point, Old Coal Field, Red Light Market, going toward Gobar Chop, Parker Paint junction. | |||||
Load Involved | 15.1 | |||||
Congo Town Back Road | October 29, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 29, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Capitol Hill | October 29, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Hill shutdown | Erection of MV and MV poles and stringing activities. | Planning MBH/EU LEC – FBBU |
0.5 |
Communities | Capitol Building, Foreign Affairs, Internal Affairs, University of Liberia main Campus, Stella Marries, Executive Mansion & Budget Bureau. | |||||
Capitol Congo Town | October 29, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Paynesville Duport Road | October 29, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Load Involved | 15.6 |
Kindly note that schedule implementation is subject to change without notice to address emergencies and other indeterminate circumstances.
Network Upgrade Related Planned Outages for October 17 Through 22
Feeders | Date/Time | Duration | Action | Work to be Carried Out | Implementer | Load |
---|---|---|---|---|---|---|
Paynesville Congo Town Feeder | October 17, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 Erection of MV poles, stringing of MV lines, Jumper closing and transformer commissioning |
Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 17, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Capitol Kru Town | October 17, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol – Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, Public Works, Gender. GSA, MCC, Sonewien, Coconut Plantation, National Police Head Quarter, Spring Mineral water, Buzzy Quarter, PHP Community, ATS, Rally Town Market, | |||||
Water & City | October 17, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town | |||||
Mamba Point 22KV Feeder | October 17, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Load Involved | 13.9 | |||||
Paynesville Congo Town Feeder | October 18, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 | Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Duport Road | October 18, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Capitol Congo Town | October 18, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Load Involved | 14.0 | |||||
Paynesville Congo Town Feeder | October 19, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 | Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Mt. coffee Express | October 19, 2022
9 a.m. to 5 p.m. |
8 hours | Mt. coffee Express shutdown | Maintenance work | LEC | 3.8 |
Communities | Caldwell New Georgia, Thump’s Up, Dixville Road, Sand Beach, Louisianan, White Plain. | |||||
Water & City | October 19, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning
MBH/EU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town. | |||||
Mamba Point 22KV Feeder | October 19, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning
MBH/EU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water. | |||||
Capitol Kru Town | October 19, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning
MBH/EU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Load Involved | 14.5 | |||||
Congo Town Back Road | October 20, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 20, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Paynesville Duport Road | October 20, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Capitol Congo Town | October 20, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Load Involved | 15.1 | |||||
Congo Town Back Road | October 21, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 21, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Capitol Hill | October 21, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Hill shutdown | Erection of MV and MV poles and stringing activities. | Planning MBH/EU LEC – FBBU |
0.5 |
Communities | Capitol Building, Foreign Affairs, Internal Affairs, University of Liberia main Campus, Stella Marries, Executive Mansion & Budget Bureau. | |||||
Gardnesville Redlight | October 21, 2022
9 a.m. to 5 p.m. |
8 hours | Gardnesville Redlight shutdown | Maintenance | LEC – FBBU | 5.1 |
Communities | Stephen A. Tolbert Estate, Black Gina, New Hope Junction, St. Francis community, Jacob’s Town, Neezoe, Jallo Shop, Pipeline Super Market, Pipeline Road, Johnsonville, Wood Camp, Morris’ Farm, Coca Cola Factory, Moses Blah Community, Omega Market, Red Hill Field, FDA up to Mount Barclay, 72nd Community, View Point, Old Coal Field, Red Light Market, going toward Gobar Chop, Parker Paint junction. | |||||
Paynesville Red-Light Feeder | October 21, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing, DO-fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Load Involved | 14.0 | |||||
Congo Town Back Road | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Capitol Hill | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Hill shutdown | Erection of MV and MV poles and stringing activities. | Planning MBH/EU LEC – FBBU |
0.5 |
Communities | Capitol Building, Foreign Affairs, Internal Affairs, University of Liberia main Campus, Stella Marries, Executive Mansion & Budget Bureau. | |||||
Capitol Congo Town | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Port | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Port feeder shutdown | To provide safety clearance for 66 KV Sleeve work on Bushrod/Stockton to Kru town OHL
Maintenance |
Planning MBH/EU LEC – FBBU |
3.1 |
Communities | Logan Town, Sayon Town, Jamaica road, Free Port, Clara Town, Doe Community, Battery Factory, Topue Village, New Georgia Junction, Super-Market, Barnesville Junction, Kesselly Boulevard, NTA Community, Opposite Chicken Soup Factory. | |||||
Bushrod – Kru Town 66kV | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Bushrod – Kru Town 66kV shutdown | Old 66 KV VT removal at Kru town Substation | Planning MBH/EU LEC – FBBU |
– |
Communities | – | |||||
Stockton – Kru Town 66 TL1 | October 22, 2022
9 a.m. to 5 p.m. |
8 hours | Stockton – Kru Town 66 TL1 | 66 KV Sleeve work on Bushrod/Stockton to Kru town OHL | Planning MBH/EU |
– |
Communities | – | |||||
Load Involved | 18.7 |
Note: On October 15, 2022, the Capitol Kru Town will be coupled the Mamba Point to energize from the Kru Town Substation from the Capitol Substation in order to have both Water & City as well as the USA Embassy feeder energized.
Kindly note that schedule implementation is subject to change without notice to address emergencies and other indeterminate circumstances.
Network Upgrade Related Planned Outages for October 10 Through 15
Feeders | Date/Time | Duration | Action | Work to be Carried Out | Implementer | Load |
---|---|---|---|---|---|---|
Paynesville Congo Town Feeder | October 10, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 Erection of MV poles, stringing of MV lines, Jumper closing and transformer commissioning |
Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 10, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Capitol Kru Town | October 10, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol – Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, Public Works, Gender. GSA, MCC, Sonewien, Coconut Plantation, National Police Head Quarter, Spring Mineral water, Buzzy Quarter, PHP Community, ATS, Rally Town Market, | |||||
Water & City | October 10, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town | |||||
Mamba Point 22KV Feeder | October 10, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning MBH/EU LEC – FBBU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Load Involved | 13.9 | |||||
Congo Town Back Road | October 11, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 11, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Paynesville Duport Road | October 11, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Capitol Congo Town | October 11, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Stockton – Capitol 66 TL1 | October 11, 2022
9 a.m. to 5 p.m. |
8 hours | Stockton – Capitol 66 TL1 shutdown | Stockton – Capitol 1 Relay programming on the 66 KV feeder at Capitol substation | Planning
MBH/EU |
– |
Communities | – | |||||
Load Involved | 15.1 | |||||
Paynesville Congo Town Feeder | October 12, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 | Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 12, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing, DO-fuse fixing | Planning
MBH/EU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Water & City | October 12, 2022
9 a.m. to 5 p.m. |
8 hours | Water & City feeder shutdown | Erection of MV and LV poles | Planning
MBH/EU |
3.6 |
Communities | West Point, Water Street, Ashman Street, Entire Broad Street up to UBA Headquarters, Johnson Street Buchanan Street, Slipway, Crown Hill, Carry Street, Bye-Pass up to RENO garage, Hilton Street, Camp Johnson Road, Benson Street, Center Street, Nelson Street, Front Street, Gurley Street, Via Town & Clara Town. | |||||
Mamba Point 22KV Feeder | October 12, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV and LV poles | Planning
MBH/EU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water. | |||||
Capitol Kru Town | October 12, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Kru Town 22KV feeder shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning
MBH/EU |
1.5 |
Communities | Ministries of Land & Mines, Information, Justice, Labor, West Point Total Gas Station community, Johansson, Rock Crusher community, UN Drive up to the Old US Embassy, Benson & New Port Street, Ministry of Finance, Newport Street, Michelin & Broad Street, Mamba Point Community, Jallah Pratt Compound, Spring Mineral Water | |||||
Kakata Weala | October 12, 2022
9 a.m. to 5 p.m. |
8 hours | Maintenance | LEC – FBBU | Planning
MBH/EU |
0.8 |
Communities | Morris’ Farm, BWI, Kakata, Cooper Farm, Weala | |||||
Load Involved | 14.7 | |||||
Congo Town Back Road | October 13, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 13, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Paynesville Duport Road | October 13, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Capitol Congo Town | October 13, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Load Involved | 15.1 | |||||
Paynesville Congo Town Feeder | October 14, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville- Congo Town shutdown | 66 KV OHL Sag fixing from Tower 9 to 1 | Planning MBH/EU LEC – FBBU |
4.1 |
Communities | Joe Bar, G.S.A Road, LBS Community, Congo Town back road, 540 Community, Ministerial Complex, S.D Cooper Road, A.B Tolbert Road, 12 Houses community, SKD Sports Complex, Rock Hill Community, King Gray, ELWA Studio Junction. | |||||
Paynesville Red-Light Feeder | October 14, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Red-Right Feeder shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU LEC – FBBU |
3.2 |
Communities | Paynesville Town Hall, Du-Port Road Methodist Church, Paynesville Kingdom Hall, Police Academy, Victory Chapel, Volker Mission, Red Light Back Road, Zazay Community, Riverside Community, Soul Clinic, Omega Community. | |||||
Capitol Hill | October 14, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Hill shutdown | Erection of MV and MV poles and stringing activities. | Planning MBH/EU LEC – FBBU |
0.5 |
Communities | Capitol Building, Foreign Affairs, Internal Affairs, University of Liberia main Campus, Stella Marries, Executive Mansion & Budget Bureau. | |||||
Gardnesville Redlight | October 14, 2022
9 a.m. to 5 p.m. |
8 hours | Gardnesville Redlight shutdown | Maintenance | LEC – FBBU | 5.1 |
Communities | Stephen A. Tolbert Estate, Black Gina, New Hope Junction, St. Francis community, Jacob’s Town, Neezoe, Jallo Shop, Pipeline Super Market, Pipeline Road, Johnsonville, Wood Camp, Morris’ Farm, Coca Cola Factory, Moses Blah Community, Omega Market, Red Hill Field, FDA up to Mount Barclay, 72nd Community, View Point, Old Coal Field, Red Light Market, going toward Gobar Chop, Parker Paint junction. | |||||
Point – 4 feeder | October 14, 2022
9 a.m. to 5 p.m. |
8 hours | Point – 4 feeder shutdown | Maintenance | LEC – FBBU | 2.1 |
Communities | St. Paul Bridge, Point #4, New Kru Town, Caldwell Community, Tweh Farm, Island Clinic, Duala, Momo Town East & West, Redemption Hospital | |||||
Load Involved | 15.0 | |||||
Congo Town Back Road | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Back Road shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
2.2 |
Communities | York Plaza, Cameroon Embassy, YWCA, boulevard Bethel Church, Lonestar Office. Cuttington Graduate School, Bernard’s Beach, Catholic Hospital, SOS, Winner Chapel Church, Polotori Congo Town back A’LA LAGON, Michael Francis Road junction. | |||||
Congo Town Min. Complex | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Congo Town Min. Complex shutdown | 66 KV OHL Sag fixing from Tower 46 – 26 | Planning MBH/EU LEC – FBBU |
3.0 |
Communities | Old Road SP Gas station, Tupee Taylor Curve, the entire Old Road, Congo Town Police Station, Joe Taye community, Peace Island community, Ministerial Complex, White Flower, In God, we trust-building 72nd Boulevard junction. | |||||
Capitol Hill | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Hill shutdown | Erection of MV and MV poles and stringing activities. | Planning MBH/EU LEC – FBBU |
0.5 |
Communities | Capitol Building, Foreign Affairs, Internal Affairs, University of Liberia main Campus, Stella Marries, Executive Mansion & Budget Bureau. | |||||
Capitol Congo Town | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Capitol Congo Town shutdown | Erection of MV poles, stringing of MV lines, jumper closing and transformer commissioning | Planning MBH/EU LEC – FBBU |
4.9 |
Communities | Bye Pass RENO Garage, Orange Office up to Benson Street, Jallah Town, City Hall, Liberia Media Center, Saye Town, The entire Sinkor to 24th Street, Air Field, Wroto Town, Old & New Matadi (Fiamah community) | |||||
Paynesville Duport Road | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Paynesville Duport Road shutdown | Erection of MV poles, stringing of MV lines, Jumper closing ,DO-Fuse fixing | Planning MBH/EU Alpha TND LEC – FBBU |
5.0 |
Communities | Zone 5 community, Du-Port Road Total Gas Station up to Benson Hospital, Du-Port Road junction up to Du-Port Road Waterside, Du-Port Road Market up to Rehab Total, Rehab Junction going toward Thinker Village, RLJ, Jamaica Resort, Rehab Junction up to Cooper Farm-ELWA, ELWA Market up to Studio Junction. | |||||
Port | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Port feeder shutdown | To provide safety clearance for 66 KV Sleeve work on Bushrod/Stockton to Kru town OHL
Maintenance |
Planning MBH/EU LEC – FBBU |
3.1 |
Communities | Logan Town, Sayon Town, Jamaica road, Free Port, Clara Town, Doe Community, Battery Factory, Topue Village, New Georgia Junction, Super-Market, Barnesville Junction, Kesselly Boulevard, NTA Community, Opposite Chicken Soup Factory. | |||||
Stockton – Kru Town 66 TL1 | October 15, 2022
9 a.m. to 5 p.m. |
8 hours | Stockton – Kru Town 66 TL1 | 66 KV Sleeve work on Bushrod/Stockton to Kru town OHL | Planning MBH/EU |
– |
Communities | – | |||||
Load Involved | 18.7 |
Note: On October 15, 2022, the Capitol Kru Town will be coupled the Mamba Point to energize from the Kru Town Substation from the Capitol Substation in order to have both Water & City as well as the USA Embassy feeder energized.
Kindly note that schedule implementation is subject to change without notice to address emergencies and other indeterminate circumstances.
Load Shedding Schedule